Friday, 11 November 2016

Filming and Editing Schedule


Our group set a target of 4 weeks starting from the 24th of October to the end of November to create 3 rough cuts of our video and be given feedback on them and make improvements if need to, the make these rough cuts we would need to film 114 different shots and edit them together and then collaborate the visuals with the song that we are using for this task.

To save time we are roughly editing our clips from home using IPads and IPhones and also recording the videos on our phones as we believe they are better quality than the cameras available and also one positive we have of editing at home is that we are making better use of time as we are not waiting to edit during school time as we can do it from home.

To be more productive with our timing we have decided to set out our filming schedule so we film all shots in one location before moving onto the next just in case we miss out any shots from that location or things start to become confusing and time consuming as we may have to film in multiple locations in one day. We use several different locations in our music video and multiple different naturalistic lightings, we do not have a preference on which order we will film our music videos however we will order it in terms of what’s available to us on that day.


Lighting also comes into play with our schedule as it gets dark very quickly leaving us little time to film using the ideal lighting we want so we have tried to schedule our filming so that we film all shots when its dark in one location or a close by location at the same time and all shots at dusk at the same time and so on.  

No comments:

Post a Comment